Location: Bo’ness, West Lothian.
Client: WESLO
Status: Ongoing.
Details: Complete refit of fire damaged house including new roof, windows, doors, joists, floors partitions, services etc, and external polymer render.
Location: Glasgow
Client: Trinity Claims.
Status: Complete.
Details: Property was damaged due to storm force winds lifting the roof tiles and allowing penetration of rain. This in turn caused the collapse of the lounge ceiling.
-
Exterior of property in Glasgow.
-
Image showing the damage to ceiling after the plaster collapsing.
-
Alternative angle of ceiling damage.
-
Remnants of damage to ceiling.
-
Close up of damage to roof section showing water entry point.
-
Removal of remainder of ceiling has begun.
-
Close-up of ceiling detail.
-
Interior of property with furniture protection in place.
-
Replacement of ceiling plasterboard in progress.
-
Removal of roof tiles to allow access for repairs.
-
Ceiling plasterboard is now in place and painting of detail is in progress.
-
Painting of ceiling detail in progress.
-
Re-painting of the remainder of the ceiling is now in progress.
-
Re-painting of the interior walls.
-
Image of the completed ceiling showing restoration to original detail and colours.
Location: Edinburgh.
Client: WNS Assistance .
Status: Complete.
Details: Works involved the strip out of the property following an escape of water and following drying works, we then completed extensive reinstatement works including new kitchen, bathroom, plasterwork, decoration, tiling floor, refurbishment and furniture removal and storage, cleaning etc.
-
Flood damage to interior walls and flooring.
-
Damage to lower walls.
-
Wall and ceiling covering removed.
-
Plasterboard panels being fitted.
-
Apes taping applied to plasterboard panels.
-
New ceiling in place with Ames taping applied.
-
New tiles being applied to kitchen area.
-
Ceiling complete and new light fittings in place.
-
Completed bathroom detail showing new floor tiles.
-
Bay window area complete with restored floor panels.
-
Completed kitchen area.
-
Completed living area with new wallpaper and refurbished floors.
Location: Kilmarnock.
Client: Claims Consortium Group.
Status: Complete.
Details: Property was flooded due to a river bursting its banks during extreme weather in January 2015. We were instructed to carry out extensive strip out works.
-
Image showing devastation caused by the river bursting its banks.
-
The kitchen after damage by flood water.
-
Alternative view of kitchen showing flood damage.
-
The living area after flood damage.
-
Flood damaged cottage after the subsidence of the river.
-
Damaged plaster board removed from partitioned walls.
-
Partitioned walls with flood damaged plaster board removed.
-
Flooring materials and associated woodwork removed.
-
External works include the use of health and safety information for public safety.
Location: Whitburn.
Client: WNS Assistance .
Status: Complete.
Details: Works involved strip down of original wall, retaining materials and rebuilding to a high standard including repainting of gates and accessories.
-
Wall blocks prior to remediation work.
-
Alternative view of wall blocks prior to remediation work.
-
Stone pillars after rebuild, prior to hanging gates.
-
Alternative view of stone pillars prior to hanging gates.
-
Close up of decorative detail.
-
Close-up of one gate after repainting.
-
Both gates re-hung onto repaired stone pillars.
Location: Edinburgh.
Client: WNS Assistance .
Status: Complete.
Details: Works involved extensive strip out including plaster and white asbestos removal then following drying works, the full reinstatement of the hall and staircase, bathroom including internal scaffolding, plasterwork, decoration, plumbing, tiling and the reinstatement of the original solid wood flooring.
-
Water damage evident to walls and flooring areas.
-
Damaged plasterwork removed showing the scale of damage to property.
-
Flood damage evident to walls and floors.
-
Panels removed from bathroom due to water damage.
-
Plasterwork removed to reveal bare walls.
-
Bedroom fittings stripped for temporary storage.
-
Respiratory equipment required due to hazard materials present in the property.
-
Damaged plasterwork removed to bare walls.
-
The bathroom area after completion.
-
Protective materials applied to stairs.
Location: Dundee.
Client: Claims Consortium Group.
Status: Ongoing.
Details: Works involve the strip out and reinstatement works to this semi-detached property following escape of water and works include replacing the complete 50 mm floor screed plasterwork, full decoration, new kitchen and bathroom, new internal doors and timber finishes, floor coverings, central heating upgrading and electrics .
-
Damage evident to original floor screeding.
-
Further detail of flood damage to walls and floor.
-
Wall and floor coverings removed due to water damage.
-
Damaged ceiling covering removed.
-
New floor screeding being applied.
-
Flood damaged plasterwork, floor screeding and ceilings removed showing extent of damage.
-
Remedial plasterwork taking place.
-
-
Completed plasterwork to wall and new floor screeding visible.
-
Completed plasterwork to walls and ceiling.
-
Completed plasterwork on walls.
-
Plasterwork underway in adjoining rooms.
-
New floor covering in place.
Location: Lanark.
Client: WNS Assistance .
Status: Complete.
Details: Works involved strip down of original wall, retaining materials and rebuilding to a high standard.
-
Image of wall showing damage caused by vehicle impact.
-
Close-up of damage caused by impact.
-
Close-up of repaired wall.
-
Another shot showing extent of repair required.
-
Wall removed and ready for rebuild. Note security fencing at side to protect public.
-
Detail of completed wall repair.
-
Wall removed and ready for rebuild with security fencing at side to protect public.
Location: Dunnet, Thurso.
Client: Claims Consortium Group.
Status: Ongoing.
Details: Works involve extensive repairs to roof and rainwater system and building fabric in Dunnet Thurso following severe storm conditions in early January 2015. We were initially asked to attend the property to carry out emergency scaffolding and temporary repairs to prevent further damage to the property in this spectacular but very exposed location. Works to complete the repairs to this property are ongoing and involve the special manufacture of replacement cast iron rainwater materials and also the supply of specially cut and sized Caithness slate for the roof repairs.
-
Close-up of scaffolding showing quite clearly the damage to the roof slates.
-
Close-up of turret showing damage to rainwater fixtures.
-
Close-up of damaged rainwater guttering.
-
Close-up of damage to roof tiling prior to erecting scaffolding.
-
Close-up detailing of round tower.
-
Elevated shot showing damage to roof slates.
-
Front elevation of house with scaffolding in place.
-
Measuring the roof slates.
-
Close-up of damaged roof slates.
-
Damaged rainwater guttering.
-
The damage to the roof slates on the turrets is quite evident here.
-
Further damage to the turret roof slates.
-
New slates being prepared for use.
-
The turret with new slates in place.
-
New slates in the process of being fitted to the main roof.
-
Roofing slates complete in this section.
-
Scaffolding erected around the property.
-
Scaffolding erected to access the tower area.
-
Close-up of scaffolding.
-
Frontal elevation of the property with scaffolding erected.
-
-
-
-
Rear elevation of property.
-
The property nearing completion.
-
The rear of the completed property with scaffolding etc, removed.