Fire Damage Restoration

Location: Bo’ness, West Lothian.

Client: WESLO

Status: Ongoing.

Details: Complete refit of fire damaged house including new roof, windows, doors, joists, floors partitions, services etc, and external polymer render.

727 false false false
Storm Force Wind Damage Repairs

Location: Glasgow

Client: Trinity Claims.

Status: Complete.

Details: Property was damaged due to storm force winds lifting the roof tiles and allowing penetration of rain. This in turn caused the collapse of the lounge ceiling.

639 false false false
Water Escape Re-Instatement

Location: Edinburgh.

Client: WNS Assistance .

Status: Complete.

Details: Works involved the strip out of the property following an escape of water and following drying works, we then completed extensive reinstatement works including new kitchen, bathroom, plasterwork, decoration, tiling floor, refurbishment and furniture removal and storage, cleaning etc.

328 false false false
River Flooding Repairs

Location: Kilmarnock.

Client: Claims Consortium Group.

Status: Complete.

Details: Property was flooded due to a river bursting its banks during extreme weather in January 2015. We were instructed to carry out extensive strip out works.

431 false false false
Ornamental gate and Pillar Repairs

Location: Whitburn.

Client: WNS Assistance .

Status: Complete.

Details: Works involved strip down of original wall, retaining materials and rebuilding to a high standard including repainting of gates and accessories.

389 false false false
Re-Instatement after Water Escape
Re-Instatement after Water Escape
Boundary Wall Repair
House of the Northern Gate
Undercover Fire Restoration
Fire Damage Repairs
Re-Instatement after Water Escape

Location: Edinburgh.

Client: WNS Assistance .

Status: Complete.

Details: Works involved extensive strip out including plaster and white asbestos removal then following drying works, the full reinstatement of the hall and staircase, bathroom including internal scaffolding, plasterwork, decoration, plumbing, tiling and the reinstatement of the original solid wood flooring.

353 false false false
Re-Instatement after Water Escape

Location: Dundee.

Client: Claims Consortium Group.

Status: Ongoing.

Details: Works involve the strip out and reinstatement works to this semi-detached property following escape of water and works include replacing the complete 50 mm floor screed plasterwork, full decoration, new kitchen and bathroom, new internal doors and timber finishes, floor coverings, central heating upgrading and electrics .

404 false false false
Boundary Wall Repair

Location: Lanark.

Client: WNS Assistance .

Status: Complete.

Details: Works involved strip down of original wall, retaining materials and rebuilding to a high standard.

374 false false false
House of the Northern Gate

Location: Dunnet, Thurso.

Client: Claims Consortium Group.

Status: Ongoing.

Details: Works involve extensive repairs to roof and rainwater system and building fabric in Dunnet Thurso following severe storm conditions in early January 2015.
We were initially asked to attend the property to carry out emergency scaffolding and temporary repairs to prevent further damage to the property in this spectacular but very exposed location.
Works to complete the repairs to this property are ongoing and involve the special manufacture of replacement cast iron rainwater materials and also the supply of specially cut and sized Caithness slate for the roof repairs.